
Algoma Steel – 3000 TPH Ship Loading Telescopic Stacker
Ontario, Canada
Assinck Limited was engaged by Algoma Steel to design and build a custom ship loading telescopic stacker with a capacity of 3000 TPH.

CRH / Dufferin Aggregates – Paris Twin Screen Wash Plant
Paris, Ontario, Canada
Assinck Limited was tasked with designing and building a custom wash plant capable of processing aggregate materials at a rate of 1000 tons per hour (TPH)

James Dick – Floating Grab Dredge Development
Caledon Sand and Gravel, Ontario, Canada
Assinck Limited successfully designed and built a groundbreaking Floating Boom Grab Dredge – a first for the Canadian aggregate industry.
